By
Thomas Krause

New order from DHL

The capacity of distribution units has to be enlarged due to increasing parcel quantity. Currently the location in Bremen will be modernized. Bromkamp was awarded to provide the energy supply as well as the entire network infrastructure. We are looking forward to continue the successful cooperation with DHL.



By
Thomas Krause

Retrofit control system of cupola

The melting process was renewed at foundry ZLH Plus in Hronec / Slovak republic within winter standstill 2016/2017. One of the mutual driven cold wind cupolas was revamped for long term operation. Bromkamp was awarded for the entire electrical scope. Thanks to excellent teamwork of participating companies ( ZLH Plus / Herp / Calderis / Ezet ) the project could be realized…



By
Thomas Krause

Retrofit of gas heated pusher furnace

A comprehensive retrofit of gas-heated pusher furnace no. 2 at Badische Stahahlwerke in Kehl was performed by Bromkamp within winter standstill 2016/2017 sucessfully and on time. Scope was revamping of basic automation system, replacement of a process control system and diverse mechanical items like all control flaps ( gas and air ) as well as parts of the supporting tube…