By
Thomas Krause

Retrofit control system of cupola

The melting process was renewed at foundry ZLH Plus in Hronec / Slovak republic within winter standstill 2016/2017. One of the mutual driven cold wind cupolas was revamped for long term operation. Bromkamp was awarded for the entire electrical scope. Thanks to excellent teamwork of participating companies ( ZLH Plus / Herp / Calderis / Ezet ) the project could be realized…



By
Thomas Krause

Retrofit of gas heated pusher furnace

A comprehensive retrofit of gas-heated pusher furnace no. 2 at Badische Stahahlwerke in Kehl was performed by Bromkamp within winter standstill 2016/2017 sucessfully and on time. Scope was revamping of basic automation system, replacement of a process control system and diverse mechanical items like all control flaps ( gas and air ) as well as parts of the supporting tube…