News



By
Thomas Krause

Retrofit of gas heated pusher furnace

A comprehensive retrofit of gas-heated pusher furnace no. 2 at Badische Stahahlwerke in Kehl was performed by Bromkamp within winter standstill 2016/2017 sucessfully and on time. Scope was revamping of basic automation system, replacement of a process control system and diverse mechanical items like all control flaps ( gas and air ) as well as parts of the supporting tube…



By
Thomas Krause

New order for automation and control system

Bromkamp was awarded to  delver the automation and control system regarding paint preparation and waste water handling for a new factory in Mississippi / USA, which produces ceiling elements. panels, hardware- and software engineering, erection and commissioning). Start of production was scheduled in spring 2017.



By
Thomas Krause

Credit rating for 2016

Bromkamp received again the top grade for 2016 with regard to financial concerns. That award was also given for 2015 and 2014.

Revamping sand preparation plant

The entire sand preparation plant of Daimler in Mannheim will be renewed in two steps. The first phase took place during the summer-standstill 2016. Customers production could start at 22.08.2016 in time. It was a compete electrical retrofit of the prepared sand plant ( operating the moulding lines no. 2 and 4 ) as well as the associated four mixers.…

Punctual start of production after revamp of cupola furnace

Low voltage equipment as well as automation system of cupola furnace including ancillary plants ( charging, heating system, ferro alloy, water treatment ) were fully renewed at Duktus foundry in Wetzlar. Furthermore new cable routes had to be designed and built to replace the wiring of all field devices. The main retrofit was made within a two week summer-standstill after…

Successful start up of gate system

The entries and exits of the new DHL parcel center in Obertshausen were equipped with a new automation system. This was done by implementing  dynamic detection systems for the truck swapbodies. The drivers will be informed about the target place and the gates were automatically controlled after check of plausibility with the in-house logistic software. Evaluation of situation, engineering, erection…